Télécharger Imprimer la page

Toshiba RBM-PMV0361E Manuel D'installation page 13

Masquer les pouces Voir aussi pour RBM-PMV0361E:

Publicité

Les langues disponibles

Les langues disponibles

6
FIXATION AFTER CONNECTION PIPES
1. After connection to pipes, fix the PMV Kit using the attached binding band so that it is held
closely to the gas pipe.
Binding band L
Binding band M
Heat insulating pipe
Refrigerant pipe
(Liquid side)
2. Set the hanging bolts for supporting pipes which are mounted at front and rear sides of PMV
Kit at within 1m intervals.
Hanging bolt
All manuals and user guides at all-guides.com
Binding band M
1 m or less
Binding band M
Heat insulating pipe
PMV Kit
10
Binding band L
Binding band M
Refrigerant pipe
(Gas side)
Refrigerant pipe
(Liquid side)
Hanging bolt
Refrigerant pipe

Publicité

loading

Ce manuel est également adapté pour:

Rbm-pmv0901e