Télécharger Imprimer la page

Toshiba RBM-PMV0361E Manuel D'installation page 11

Masquer les pouces Voir aussi pour RBM-PMV0361E:

Publicité

Les langues disponibles

Les langues disponibles

Pipe forming/End positioning
Flaring
1. Cut the pipe with a pipe cutter.
OK
90˚
2. Insert a flare nut into pipe, and flare the pipe.
As the flaring sizes of R410A differ from those of
refrigerant R22, the flare tools newly manufactured
for R410A are recommended.
However, the conventional tools can be used by
adjusting projection margin of copper pipe.
Flaring diam. Meter size:
A (Unit: mm)
Outer diam. of copper pipe
6.4
9.5
* In case of flaring for R410A with the conventional
flare tool, pull it out approx. 0.5mm more than that
for R22 to adjust to the specified flare size.
The copper pipe gauge is useful for adjusting
projection margin size.
Projection margin in flaring:
B (Unit: mm)
Rigid (Clutch type)
R410A tool used
Outer diam. of
copper pipe
R410A
6.4
0 to 0.5
9.5
0 to 0.5
Imperial (Wing nut type)
Outer diam. of copper pipe
6.4
9.5
All manuals and user guides at all-guides.com
NO GOOD
Obliquity
Roughness
Warp
A
+0
A
- 0.4
R410A
9.1
13.2
B
Conventional tool used
R410A
1.0 to 1.5
1.0 to 1.5
R410A
1.5 to 2.0
1.5 to 2.0
Connection of refrigerant pipe
Connect all the refrigerant pipes with flare connecting
work.
• Since the atmospheric pressure only is sealed as the
sealing gas, it is not abnormal that "Pushu..." sound
is not heard when the flare nut is removed.
• Be sure use a double spanner for pipe connecting
work of the indoor unit.
Work using double spanner
• Refer to the following table for tightening torque.
Connecting pipe
outer diam. (mm)
Ø6.4
(1.4 to 1.8 kgf•m)
Ø9.5
(3.3 to 4.2 kgf•m)
REQUIREMENT
If an excessive torque is applied, the nut may
crack depending on the installation conditions.
8
Tightening
Re-tightening
torque (N•m)
torque (N•m)
14 to 18
18 (5.0 kgf•m)
33 to 42
42 (4.2 kgf•m)

Publicité

loading

Ce manuel est également adapté pour:

Rbm-pmv0901e