Télécharger Imprimer la page

GEBUWIN TL150 Serie Mode D'emploi page 12

Publicité

Les langues disponibles

Les langues disponibles

3.3. Cable mounting
For the choice of cable, chart 1 must be consulted.
The cable must run-off upwards from the right side of the drum.
Be careful!
The brake does not work in the case of an incorrect cable run-off.
The cable length must be of sufficient length to allow for 3 windings to remain on the drum when in the lowest
position.
The cable mounting is done by means of the fixed cable clamp.
3.4. Before use
To enable the load pressure brake to function correctly, the winch
must carry a minimum load of approx. 20% of the nominal load.
3.5. Operating
The winches are suitable for manual operation only.
For the load to be hoisted, turn the crank clockwise.
For the load to be lowered, turn the crank anticlockwise.
TL150, TL1500
TL300, TL600
TL1000
11

Publicité

loading

Ce manuel est également adapté pour:

Tl300 serieTl600 serieTl1000 serieTl1500 serie