Télécharger Imprimer la page

GE PowerMark Plus Instructions D'installation page 3

Panneaux de distribution, 10 à 42. circuits à phase simple et triple de 100-225 a, type à l'épreuve de la pluie

Publicité

Les langues disponibles

Les langues disponibles

16 – Important
Retighten all electrical connections before energizing the load
center.
17 – Install the Shield
a. Rotate the cover latch clockwise.
b. Install the shield and tighten the shield-fastening screw.
18 – Identify Circuits
Use the labels provided to identify the circuits for the user's
convenience.
19 – Install the Door
Drive in the hinge screws.
NOTE: Retighten all electrical connections before energizing
the load center.
Attention – Procedure for Aluminum Terminations
1. Strip the insulation, being careful to not nick the wire.
2. Clean the wire strands with a wire brush.
3. Thoroughly coat the stripped conductor with a suitable
antioxidant compound, such as ALNOX or PENETROX
A13.
4. Insert the conductor and tighten the connector screw to
the indicated torque, as indicated on the rating label.

Publicité

loading