Télécharger Imprimer la page

Barrette RDI Elevation Rail Instructions D'installation page 9

Rail de câble

Publicité

Les langues disponibles

Les langues disponibles

4.
a. Clamp top beam on the side of the stair posts aligning
it with the brackets. Mark the beam at the posts
(Fig. 29). Cut the top beam on that mark and on
that angle.
NOTE:
Top of the beam has the larger open channel. Be
sure the beam is oriented the correct way before
you clamp, mark and cut.
b. Place beam between posts and press onto brackets.
Use provided hex head screws and attach one screw
at the end of the beam at each post (one at upper
post and one at lower post). Use the line etched into
the beam as a guide for your screw. Screw should be
on the line and approximately
beam (Fig. 30).
5.
a. Feed cable through tension spring B and tensioner.
Place tension spring B and tensioner into top beam at
lower post (Fig. 31).
NOTE:
These are separate pieces. Feed cable through the
block and spring first, then tensioner.
b. Make sure the cable is rounding the last turn of the
guide by looking down the post (Fig. 32). Pull all
slack through the tensioner. Also ensure the tension
spring stays in place in the beam at the post before
pulling tight.
c. Locate tension spring A and repeat step 5 at top of
stairs.
6.
Pre-tension cable on guide A and B by pulling as much
slack through the locker by hand (Fig. 33). Make sure the
cable is rounding the last turn of the guide by looking
down the post (Fig. 32).
NOTE:
THIS STEP IS CRUCIAL TO ATTAIN PROPER
FINISHED TENSION. PULL HARD.
Wearing a glove may help while pre-tensioning. Ensure
the cable is centered in the cable guide while pulling
tight (Fig. 32).
" from the end of the
1
2
" ~
"
1
~
2
1
2
Fig. 29
Fig. 30
Fig. 31
Fig. 32
Fig. 33
9

Publicité

loading