Télécharger Imprimer la page

Barrette RDI Elevation Rail Instructions D'installation page 7

Rail de câble

Publicité

Les langues disponibles

Les langues disponibles

12.
Cut excess cable leaving approximately 12"
remaining from each guide. This excess will remain
in the top beam channel.
13.
Mid support baluster. Locate the center of your
section. Place mid support in center of the span.
Mark 2 top and 2 bottom holes. The bottom of the
mid support can be identified by a hole near its
base (Fig. 19). Remove support and predrill with a
" drill bit. Return support to center of span and
1
8
attach with included screws. Align the mid support
cover with mid support and secure with flat head
screws (Fig. 20). The
top beam and the 1
surface. The holes on the outside of the support will
line up with the covers to join them. Use attachment
plug to insert in one half of mid support trim ring.
Place both halves at bottom of support and push
together (Fig. 21).
14.
Take the measurement from Step 7 and subtract
(X-
"). Cut the top rail to that measurement. Place
1
4
the cut rail over the beam and snap into place using
a rubber mallet if needed.
15.
Place appropriate end, line, or corner post cap onto
the top of each post and press or tap into place with
a rubber mallet if needed.
Installation for Stairs
1.
a. Determine post placement. There can be a maximum
of 5 risers between posts. Posts base plates should
be set back 2" from the nose of the stairs (Fig. 22).
Mount posts per post instructions from level section.
b. Remove stair cable guide assembly from packaging.
Lay assembly on the ground near the posts it will
be inserted in. Unspool each loop of cable fully so
they are free of kinks. Allow the cables to lay flat and
straight on the ground (Fig. 23).
" screws attach into the
3
4
" screws attach to the deck
1
2
Fig. 20
"
1
4
Fig. 19
Fig. 21
Fig. 22
2"
Fig. 23
7

Publicité

loading