Télécharger Imprimer la page

Barrette RDI Elevation Rail Instructions D'installation page 4

Rail de câble

Publicité

Les langues disponibles

Les langues disponibles

Deck/Wood Surface Installations:
a. For decking applications, use the provided secondary
mounting plate when securing posts in place.
b. Beneath all post locations install at least two 2"x8"
blocks using at least three #10x3
penetrating through the joists at least 1
blocks (sold separately) (Fig. 6 & 7).
c. Mark holes through the bottom plate of steel post
onto deck surface. Remove steel post and drill
holes in all four marks through deck board and
blocking.
d. Purchase
stainless steel bolts, nuts and fender washers. Bolts
need to be approximately 1" longer than the distance
between steel mounting plate and bottom of blocking.
e. Push bolts through post plate. (Fig. 8). Posts can be
leveled as needed by using shims.
f. Tighten bolts, install base trim sections around post.
Take one side of base trim and push plastic plugs
through the hole underneath. Take second half of
base trim and push together (Fig. 9).
3.
Remove level cable guide assembly from packaging.
Lay assembly on the ground near the posts it will be
inserted in. Unspool each loop of cable fully so they are
free of kinks. Allow the cables to lay flat and straight on
the ground. (Fig. 10)
4
" diameter hot dipped galvanized or
3
8
" deck screws
1
2
" into the
1
2
"
7
16
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Base trim
Base trim
Fig. 10

Publicité

loading