Télécharger Imprimer la page

Venmar Chef VCQSEN1 Serie Manuel D'installation, D'utilisation Et D'entretien page 18

Masquer les pouces Voir aussi pour Chef VCQSEN1 Serie:

Publicité

Les langues disponibles

Les langues disponibles

N
1 ] Run house power cable between service panel and hood location. Run the house power cable
2 ] Hang hood from (4) mounting screws previously installed. Slide hood back towards wall until
3 ] Connect ductwork to hood and use metal foil duct tape to make joints secure and air-tight.
18
Install the Hood (Standard Installation)
OTE:
Two installers are recommended because of the weight of this hood.
into the hood through the strain relief previously installed in step 6 on page 10.
mounting screw heads are engaged in narrow end of keyhole slots in top of hood. While
holding the hood, tighten screws securely. Attach power cable to the hood using the strain
relief.
Make sure the damper assembly (or round duct plate) enters the ductwork and that the
damper opens and closes freely.
DUCTED INSTALLATION ONLY

Publicité

loading

Ce manuel est également adapté pour:

Chef vcqdd1 serieChef vcqsen130ss