Télécharger Imprimer la page

Bosch Junkers TA 211 E Mode D'emploi page 12

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 16
TA 211 E
With the installation of the TA 211 E Regu-
lator, the electronics of the heating unit au-
tomatically use the pump switching type III
(continuous pump operation), also when
the factory setting was not changed!
The figures
and
6
application of the TA 211 E with radiator and
floor heating systems.
The corresponding electrical connection dia-
gram (Figure
to
8
10
Legend for the Figures
P
Circulation pump
I
SF
Storage temperature sensor (NTC)
B
Mechanical flow temperature limiter
2
(only in connection with underfloor
heating systems)
AF
Outside temperature sensor
WS
Warm water storage
RK
Check valve
E
Venting valve
5.1
Electrical Connection of the Outside
Temperature Sensor (AF)
• Remove the cover (AF
• Insert the cable through the threaded
fitting (AF
) and connect to the two termi-
d
nals (AF
).
e
• Tighten the threaded fitting (AF
strain relief and splash water protection is
provided at the cable feed-through.
• Close the outside sensor.
• On the boiler, insert the cable through the
protective sleeve and secure with the strain
relief.
• Connect the cable to the TA 211 E on the
terminals "A" and "F" (Figure
12
are schematics of the
7
) is to be used.
to
6
10
:
with AF
, Fig.
c
b
) so that
d
to
).
8
10
5.2
Electrical Connection of Accessories
(Figure
5.2.1 Time Switch
• Connect the time switch (if available) ac-
cording to Figure
board of the boiler to connector ST 5
5.2.2 Remote Control (not in UK)
• Connect the TW 2 Remote Control
(in case available) on the TA 211 E to the
terminals 3 and 4 (Fig.
• Connect the TFQ 2 T, TFQ 2 W or TFP 3
Remote Controls (in case available) to the
terminals 1, 3 and 4 (Fig.
5.2.3 Mechanical Flow Temperature
Limiter
• An additional mechanical flow temperature
limiter is to be connected to the feed of floor
heating systems. The electrical connection
is to be made according to the installation
instructions of the heating unit.
5.3
Closing the Switching Box
• Replace the cover (h) and screw in the
).
3
screw (g, Fig.
• Snap in the cover (f, Fig.
to
)
8
10
on the main circuit
8
).
9
).
10
).
12
).
11
.

Publicité

loading