Télécharger Imprimer la page

Publicité

Liens rapides

QUICK INSTALL GUIDE - EC10
The plug and play EC10 switch is a ten port unmanaged Ethernet over Coax
switch. This powerful switch delivers fast ethernet and PoE+ over coax cable with
3,000 ft (915m) reach. EC10 was designed to make the migration to IP quick, easy
and cost effective by leveraging an existing coax infrastructure. For complete
details refer to the Hardware Installation Guide at www.nvtphybridge.com.
NOTE: Please see page 3 for important safety instructions
EC10 SWITCH
Front
1
3
5
7
POWER
2
4
6
8
Power LED
Downlink Ports 1-10
Installation Details
Location Requirements:
Power – The AC/DC Power Adapter must be placed within 6 feet of an available power source.
Ventilation – To ensure proper ventilation of the EC10, leave at least 2 inches of unobstructed space on all sides of the unit.
Downlink – The EC-Link adapters should be installed a minimum of 6 feet away from the EC10 switch.
Installation procedures will be trouble free if you ensure that the following items are available before you begin:
• The CLEER switch model EC10, and all cables and accessories you received in the EC10 package
• All EC-Link Adapters required for connecting the IP endpoint devices.
• Standard CAT5e copper LAN cables for the uplink trunks (user supplied).
• Coax cable for the downlink ports (user-supplied).
HARDWARE TOPOLOGY AND INSTALLATION OVERVIEW
1. Remove the EC10 switch and all accompanying accessories.
2. Remove all legacy cameras from the Coax cable.
Note: It is extremely important that non-IP, non-PoE cameras are not connected when you power on the EC10.
3. Connect an EC-Link to the Network jack on the IP endpoint and connect the BNC Jack on the EC-Link to one end of the Coax cable.
4. Connect the other end of the Coax cable to BNC connectors on the EC10 switch.
5. Connect the uplink cable from a Gigabit port to the IP PBX or network switch.
6. Power up the EC10.
7. For troubleshooting, please refer to the Hardware Installation Guide located at www.nvtphybridge.com.
8. To reset the unit, press the reset button.
EC10 Switch
1
3
5
7
9
POWER
2
4
6
8
10
10 x 100 Mbps PoLRE BNC
2 x 1 Gbps Copper to
LAN/SWITCH/NVR
888.901.3633 | +44 (0) 208 977 6614 | www.nvtphybridge.com
All manuals and user guides at all-guides.com
GbE 1
9
GbE 2
10
Uplink Ports 1-2
Network Infrastrusture
BNC Port
100 Mbps PoLRE
Coax Cable
GbE 1
GbE 2
100 Mbps PoLRE
Coax Cable
Back
POWER
RESET
Reset Button
DC Jack
EC-Link
Ethernet Side
RJ45 Port
100 Mbps PoE
CAT5
100 Mbps PoE
CAT5
EC10
EC10 Switch Package Includes:
1 x AC/DC Power Adapter
EC-Link Package
(Sold Separately)Includes:
IP Endpoint
IP Endpoint
Copyright 2020 NVT Phybridge | 413-0006-C | Page 1
1 x EC10 Unit
1 x Quick Install Guide
1 x EC-Link

Publicité

loading

Sommaire des Matières pour NVT Phybridge EC10

  • Page 1 Power – The AC/DC Power Adapter must be placed within 6 feet of an available power source. Ventilation – To ensure proper ventilation of the EC10, leave at least 2 inches of unobstructed space on all sides of the unit.
  • Page 2 • For å sikre tilstrekkelig kjøling av utstyret, må det være 2 tommers uhindret plass rundt alle sider av enheten. • For å unngå fare for støt eller brannfare, bytt sikring med samme type og karakter. 888.901.3633 | +44 (0) 208 977 6614 | www.nvtphybridge.com Copyright 2020 NVT Phybridge | 413-0006-C | Page 2...
  • Page 3 TECHNICAL SUPPORT The NVT Phybridge Technical Support Group is available to assist you with product installation, configuration, monitoring and troubleshooting procedures. Should you experience trouble with this equipment or for repair or warranty information, please contact NVT Phybridge Inc. at +1 905.901.3633 or support@nvtphybridge.com.
  • Page 4 Operating Temperature international safety standard at maximum ambient 50°C Humidity 10% to 95% (non-condensing) at 35° C Specifications subject to change without notice. 888.901.3633 | +44 (0) 208 977 6614 | www.nvtphybridge.com Copyright 2020 NVT Phybridge | 413-0006-C | Page 4...