Attaching The Carrying Strap - AEG BK 6 Mode D'emploi

Masquer les pouces Voir aussi pour BK 6:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
20
Promptly wipe up any condensation. after extended cooling periods moisture will con-
dense into water drops inside the coolbag. This does not mean the device is defective.
Wait approx. 5-10 min when switching between cooling and heating to allow the
heating/cooling electronics to reach the correct temperature.
do not use ice packs or ice bags in the board bar. Melt water can damage the board
bar.

Attaching the carrying strap

Fig. 1
Fig. 3
attach the included carrying strap in the order Fig. 1 to 5.
Fig. 4
Fig. 2
Fig. 5

Publicité

Table des Matières
loading

Table des Matières