Télécharger Imprimer la page

Bertazzoni KOTR30MXE Guide D'installation page 8

Masquer les pouces Voir aussi pour KOTR30MXE:

Publicité

Les langues disponibles

Les langues disponibles

• Next, secure mounting plate to the wall by tightening toggle
bolt assemblies or lag screw(s). See Figure 21.
Figure 21
• Drill
3
/
" diameter lag screw hole(s), into one or more wall
16
studs.
(Remember, you must have at least one lag screw
secured to a wall stud.) For stud location refer to WALL
CONSTRUCTION, see page 3.
• Tighten the lag screw(s) into wall stud(s).
Mounting Oven to The Wall
NOTE: IT IS VERY IMPORTANT THAT THIS OVEN BE
INSTALLED BY TWO PEOPLE.
IMPORTANT: DO NOT GRIP OR USE HANDLE DURING
INSTALLATION.
Preparation of Top Cabinet
You need to drill holes for the top support screws and a hole
large enough for the power cord to fit through.
Read the instructions on the TOP CABINET TEMPLATE.
Tape it underneath the top cabinet.
Drill the holes, following the instructions on the template.
NOTE: TOP CABINET TEMPLATE instruction must be
installed to proceed.
STEP 1
• Protect the top of your range by placing a portion of the
carton or some other heavy material over the cooking
surface before mounting your oven.
STEP 2
• Lift the microwave oven and tilt it forward.
• Hang the unit on two tabs at the bottom of the mounting
plate. See Figure 22.
Figure 22
E
All manuals and user guides at all-guides.com
8
STEP 3
• Thread power cord through the hole at the bottom of the
top cabinet.
• Swing the unit upward to meet the top of the mounting plate
and hold it securely. See Figure 23.
Figure 23
STEP 4
• Insert a bolt through the provided washer and then through
each hole in the upper cabinet bottom.
• Tighten the bolts until the gap between the upper cabinet
and microwave oven is closed. See Figure 24.
Figure 24

Publicité

loading