Télécharger Imprimer la page

Danfoss DWH Opti Installation Et Maintenance page 4

Publicité

EN – UK-specific appendix
1
Important information/Safety regulations
E
For important information and safety regulations, please read the Danfoss DWH installation/maintenance manual.
E
Hard Water Areas; In areas where exceptional water conditions prevail, consideration may need to be given to the fitting
of a device capable of inhibiting scale. In such circumstances the advice of the local water authority should be sought.
E
Note! Leave this document with the end-user.
This document is an integral and essential part of the product. It should be kept with the appliance so that it
can be consulted by the user and our authorised personnel.
Please read carefully the instructions and notices about the appliance contained in this manual, as they pro-
vide important information regarding the safe installation, use and maintenance of the water heater.
Heat up time
The heat up time is measured when heating the water from 14°C to 60°C.
DWH 300: Heat up time 1 hour 53 min
DWH 200: Heat up time 1 hour 3 min
Re-heat time
The re-heat time is measured when 70% of the hot water has been drained and replaced by equal amount
14°C water and re-heated to 60°C.
DWH 300: Re-heat times 70% 1 hour 25 min
DWH 200: Re-heat time 70% 41 min
4
All manuals and user guides at all-guides.com
VMBNB72J

Publicité

loading

Ce manuel est également adapté pour:

Dwh