Powering The Unit; Preparing The Reservoir - Waterpik SIDEKICK Instructions D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5
GETTING STARTED
Assembly
1. Remove power supply from power supply storage.
2. Connect power supply cord to power supply and to base unit.
3. Place reservoir on base unit and press down firmly until secured.
4. Connect water hose to base unit.
5. Using handle notch, hook handle onto front edge of reservoir.

Powering the Unit

Plug the power supply into an electrical outlet. If the outlet is controlled by a wall switch, be sure it is turned on.

Preparing the Reservoir

Fill
Remove reservoir from base unit and fill with warm water. Replace reservoir onto the base unit and
press down firmly.

Publicité

Table des Matières
loading

Table des Matières