Unpacking The Compactor - GE GCG1580 SS Instructions D'installation

Masquer les pouces Voir aussi pour GCG1580 SS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

UNPACKING THE COMPACTOR

1
• Move the compactor close to the installation
location.
• Use a section of the shipping carton to protect the
finished floor.
• Do not use the handle to lift the compactor.
• Remove all protective packaging materials such as
tape or shipping pads. Remove waxy residue caused
by shipping material with a mild solution of liquid
household cleaner and water.
• Check that the power supply cord is attached to the
cord clip on the rear of the compactor.
IMPORTANT: Use the shipping carton as a pad.
Do not slide the compactor across a finished floor.
Damage will occur.
Installation Preparation
Cord clip
UNPACKING THE COMPACTOR
(CONT.)
• Open the compactor drawer and remove any
shipping materials or other items shipped in the
drawer.
• Do not remove the compactor bag (if installed).
• Grasp the sides of the drawer and lift it out of the
compactor. Place the drawer on a protected surface.
The drawer can scratch a finished floor.
6

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gcg1500 bbGcg1500 wwGcg1700 iiZcgs150 ssZcgp150 iiAppliances gcg1580 ss ... Afficher tout

Table des Matières