Télécharger Imprimer la page

ATH-Heinl Frame Lift 30FZ Manuel D'utilisation page 65

Masquer les pouces Voir aussi pour Frame Lift 30FZ:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 91
9. After setting up, fill in the attached inspection log.
This information is needed in case of service.
Bleeding the hydraulic system
1. After first filling with hydraulic oil, the lift button
must be pressed for about 30 seconds to pump
the oil into the hydraulic system.
2. Lift the lift up to the maximum lift height. (This
may NOT exceed 1,900mm)
3. Open the upper cover of the control box and
press the button to bypass the limit switch (5)
and the button to bridge the light barrier (6)
for a few seconds until both scissor platforms
are at the same height.
4. Completely lower the lift by pressing the
lowering button.
5. Repeat lifting and lowering operations at least
twice more
Emergency lowering in the event of a power failure
1. Switch off the lift with the main switch and
secure it against being switched on again
2. Open the front cover of the control box
3. Loosen the safety valve screw (A) by turning it
counter-clockwise
4. The lowering movement of the lift is triggered
by loosening the lowering valve screw (B).
!!! WARNING!!: The lowering speed can be
adjusted with this screw!
5. After fully lowering the lift, all screws must be
tightened again.
2.10 Completion of Work
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2021-09
Manufacturer ATH-Heinl GmbH & CO.KG
- 20 -

Publicité

loading

Produits Connexes pour ATH-Heinl Frame Lift 30FZ