Télécharger Imprimer la page

ATH-Heinl 7 Mode D'emploi page 67

Publicité

Les langues disponibles

Les langues disponibles

2.0
INSTALLATION
The machine must be installed by an authorised person according to the instructions.
The operating instructions (including the log) are an important part
The product must be checked after completion of the installation, handover, if necessary briefing and then
regularly in accordance with the applicable regulations and legal provisions in the country of operation by a
suitable and approved company or facility.
foundation:
Conditions:
Concrete deep:
Max. Slope
Concrete quality:
Concrete hardening time:
If soils do not comply with the requirements, there could evoke serious injuries to personal or
damages to the lift.
Do not install the lift on asphalt, soft concrete floor-
There must be no expansion joints or cuts, which will break the continuity of the upper reinforcement.
Load-capacity of false ceilings must be checked by operator.
2.1
Transport & Storage Conditions
When transporting and positioning the machine, always use suitable lifting and material handling
equipment and consider the machine's centre of gravity.
The machine should only be transported with the original packaging.
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2022-02
of the machine / product.
!!!PLEASE STORE CAREFULLY!!!
Horizontal and flat
200 mm
10 mm
C20/25
Min. 20 days
Manufacturer ATH-Heinl GmbH & CO.KG
- 14 -

Publicité

loading

Ce manuel est également adapté pour:

7f7q7qf