SCAN domestic KK 501 Manuel De L'utilisateur page 8

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
Don't leave the packing and our components near the chil-
dren. Danger of suffocation!
Never try to repair the cabinet.
In the case the equipments have lock. Save the key far away
from the children.
Installation
Unpacking the cabinet
-
Take off the plastic packing and remove the protections and
pallet.
-
Take care to see that the cabinet packing is placed out of
the reach of children. If possible, try to put the packing in a
place where it could be recycled.
-
Check whether the cabinet has been damaged during trans-
port.
As applicable:
-
Place the two levies M8 underneath the front of the cabinet
simply by screwing in the two holes.
-
Apply the four feet of 150mm with a key 10.
-
Place the handle (there is inside the cabinet)in the door of
the cabinet, for that tighten the screws.
-
The weight limit for each shelve should be 40 kg.
-
Pull the electrical cable through the opening in the rear
grille.
Locating the cabinet
-
Set the cabinet on the level using the leveling feet or the
adjustable feet.
-
The cabinet should be located in a dry place, on a horizontal
surface which can support its weight when fully loaded.
-
Avoid moving the cabinet when it is fully loaded.
-
The cabinet should be placed away from any heat source
and the rays of the sun so as to reduce power consumption.
Do not obstruct the ventilation and maintenance grilles.
Connecting the cabinet
-
Before connecting the cabinet, check whether the voltage
indicated on the cabinet corresponds to the voltage of your
wiring. It is essential that you should connect the cabinet
to an earthen power point. Make sure that the cable does
not stay coiled. If the cable is not long enough, it should
be replaced by a skilled person. Do not use an extension or
adapter cable.
-
The cabinet must be placed in such way that the plug is vis-
ible.
Control
Starting
-
If the cabinet has been transported horizontally, it should be
left to rest for at least an hour before being connected.
-
Put the cabinet in place while leaving a space of 3 to 5 cm
between the cabinet and any other furniture or wall, so that
there is a natural air flow, and in a spot where the surround-
ing temperature is between +16 ºC and +32 ºC.
-
Connect to a power point, push the green switch, place the
temperature selector in the medium position and leave the
cabinet working for 2 to 3 hours, so as to make sure that it is
operating normally.
-
N.B: Before being connected, the cabinet must be cleaned
with a detergent for washing dishes; do not use corrosive
products or soap. Then dry carefully. To carry out this opera-
tion is obligatory to switch off the equipment by removing
the plug from the outlet.
Operation
-
Cabinet operation is totally controlled by the thermostat, for
selecting the temperature inside the cabinet.
-
Cabinet operations are controlled by a thermostat for select-
ing the temperature inside the cabinet.
-
Plug the cabinet to the current.
-
If the information in the display shows "OFF", press the ON/
OFF switch for 3 seconds.
-
Wait about 3 minutes before the compressor starts after con-
necting the cabinet.
-
To disconnect, push off the main switch ON/OFF(the display
will show "OFF") or simply unplug the cabinet.
-
Wait 10 minutes before reconnecting the cabinet.
-
Load the cabinet in such a way that the products are care-
fully stocked.
-
The digital thermostat allows adjusting the temperature
from + 1ºC to + 10ºC.
-
The thermostat is factory locked, only permits to adjust the
desired temperature (set point).
-
To program the desired temperature, press ON/OFF + ▲ or
▼ buttons.
-
To lock the keyboard again proceed as stated above and
select "YES" in the "LOC" function.
-
The display will indicate the temperature of the cabinet.
-
N.B.: The differential has been regulated at 3ºC in the plant.
-
When loading the cabinet in its totality it is possible that
the alarm begins to ring after 2 hours if the cabinet has not
reached yet the programmed temperature. Push any buttonv
to turn off the buzzer and await 12 hours for stabilization of
the temperature. In case the programmed temperature hasv
not been reached in this space of time, contact our technical
services.
8

Publicité

Table des Matières
loading

Produits Connexes pour SCAN domestic KK 501

Ce manuel est également adapté pour:

Kk 601

Table des Matières