Regalo 1163WS Mode D'emploi page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Assembling and Installing Your Gate
STEP 1
Locate the (4) threaded spindle rods (F) Rotate the adjustment
wheels along the threading, eliminating the gap between the
adjustment wheel and the rubber foot.
STEP 3
Position the gate (B) so that it is level and centered within your
doorway or opening. Rotate the adjustment wheels on the threaded
spindle rods in the opposite direction as in Step 1, expanding the
gap between the rubber foot and the adjustment wheel. Expand each
of the (4) threaded spindle rods until they make contact with the
doorway or opening. Do not fully tighten the threaded spindle rods
yet.
NOTE:
The gap between the gate and wall should not exceed more
than 2.5 inches. Make the appropriate adjustment to ensure you
have installed your gate safely.
All manuals and user guides at all-guides.com
ADJUSTMENT WHEEL
RUBBER FOOT
STEP 2
Insert the (4) threaded spindle rods into the holes at each of the
four corners of the gate.
NOTE:
You will notice a slight gap between the gate door latch
and the frame. This is not a defect. Your gate is a pressure
mounted gate and this gap will disappear once you tighten your
gate in its opening.
STEP 4
RECEIVING COMPONENT
OUTER HOUSING
When you are satisfied with the general placement of your gate,
fully tighten the threaded spindle rods attached to the lower
corners of the gate by further rotating the adjustment wheels.
Continue by tightening the upper threaded spindle rods. As you
tighten the threaded spindle rods, you will notice the gap
between the door frame and the secure slide latch begin to
narrow. In order for the gate to function properly, stop
tightening the upper threaded spindle rods just before the outer
housing of the secure slide latch and the receiving component
touch.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1168ws

Table des Matières