Fixing The Frame - ROBLIN Cubix Centrale 600 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FIXING THE FRAME

If you wish to adjust the height of the frame, proceed
as follows:
• Unfasten the eight metric screws joining the two col-
umns, located at the sides of the frame.
• Adjust the frame to the height required, then
replace all the screws removed as above.
• Fix the Fixing Part of the Upper Chimney 26 to the
hanging kit using the 2 screws 12w (M3 x 8).
• Lift up the frame, fit the frame slots onto the screws
up to the slot end positions.
• Tighten the two screws and fasten the other two
screws provided; before locking the screws com-
pletely, it is possible to adjust the frame by turning it,
making sure that the screws do not come out of their
housing in the adjustment slot.
• It is now possible to place and tighten the 4 safety
screws, Proceed as follows:
• drill the ceiling with a 10 mm ø bit taking as refer-
ence the holes of the side parts of the
chimney fixing part.
• insert the 4 dowels (provided).
• insert the washers (provided) to the screws and
tighten the screws
• The Frame must be securely fastened so as to support
both the weight of the Hood and the stress caused by
occasional axial pressure against the fitted Appli-
ance. After fixing, make sure that the base is stable
even when the Frame is subjected to lateral stress.
• If the Ceiling is not strong enough in the area where
the hood is to be fixed, the Installer must strengthen
the area using suitable plates and counterplates an-
chored to resistant structures.
EN
1
2
upper
12w
26
1
2
2
21
1

Publicité

Table des Matières
loading

Table des Matières