Stop. You have completed grounding the bay assembly.
Installing the Line Cards
This section describes how to properly install the line cards. The following topics are included in this
section:
Preparing the Work Surface for Installing Line Cards, page 25
Transporting Line Cards, page 27
Handling Line Cards, page 28
Removing and Installing Line Cards, page 29
Preparing the Work Surface for Installing Line Cards
This section illustrates how you and the work surface that you are placing the line card on must be
properly grounded. As shown in
Ground yourself by wearing an ESD wrist band that is connected to the earth ground.
Ground the table to the earth ground.
Ground the chassis to the earth ground.
Ground the rack to the earth ground.
78-18960-03
Figure
13, ensure that you follow these steps:
Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms
Installing the Line Cards
25