Overview
(6) Attachment eyelet
(7) Power switch
(8) Fuseholder
(9) Fluid level display
(10) Power supply
STARTING OPERATION
Remove all packing materials from the shipping box. Make sure that there are no packing remnants at the
fog output nozzle.
Unscrew the tank cap and fill the tank with fog fluid. Tightly close the tank again.
Install the device on a plane surface.
15/28
(1) Escape nozzle
(2) Housing
(3) Mounting bracket
(4) Fluid tank
(5) Remote control
00099595, Version 4.2