Helios AIR1-KP Notice De Montage Et D'utilisation page 11

Pour les centrales air1 et les batteries de refroidissement
Masquer les pouces Voir aussi pour AIR1-KP:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and Operating Instructions
ATTENTION
Condensate pump AIR1-KP
3. Mount the holder as follows, see Fig. 6.
4. Use the large hose to connect the float unit and the condensate drain, see Fig. 7.
The pump unit outlet hose must always be higher than the float unit, see Fig. 8.
The power supply must come from a different mains power supply to the power supply of the
AIR1 unit, so that the condensate can be pumped even after the unit has stopped. However,
it is fundamentally possible to obtain the power supply via the terminal box of the AIR1 unit.
If necessary, establish the electrical connections between the condensate pump and the
terminal box of the AIR1 ventilation unit (see wiring diagram in the installation and operating
instructions for the corresponding AIR1 ventilation unit).
Fig.7
Float unit
Pump unit
X
4
Float unit
Pump unit
Fig.5
Fig.6
Fig.8

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Air1-kp xc 500Air1-kp xc 700Air1-kp xc 1400Air1-kp xc 2200Air1-kp xc 3200

Table des Matières