Spare Parts - ACIS Jet Vag 155T Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

POMPE NCC OU BALNEO
CCS OR BALNEO PUMP
9. ASSEMBLY
ATTENTION :
All the parts to be assembled must be clean and in perfect operating condition. To assemble the pump:
Fit the mechanical seal, fit the rotating part of the mechanical seal on the aft ledge of the turbine and push it into
its housing. Pour some water on the ring before starting above operation.
Assemble the turbine on the shaft and thereby ensure the mechanical connection.
When the pump is coupled to the motor, make sure the diffuser protrusion goes into the appropriate housing
and take utmost careful the location of the seals.

10. SPARE PARTS

To order spare parts, state the name, the number on the disassembly drawing (fig. 1) and the data on the ID plates.
11. DUAL-SPEED PUMP
We advocate use of this pump as well:
- High speed: water circulation
- Slow speed: filtration
For wiring, refer to the diagram of the terminal box.
15 Rue des Marais 44310 ST Philbert de Gd Lieu – Tel. 02 40 59 95 35 – www.acis-france.com
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Jet vag 175mJet vag 215mJet vag 255tJet vag 295tJet vag 405t

Table des Matières