6: Factory Reset - Danfoss HC Guide D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24
Installation Guide
Configuration

6: Factory reset

• Disconnect the power supply for Danfoss Link™ HC.
• Wait for green LED to turn off.
• Press and hold the Install / Link Test.
• While holding the Install / Link Test, reconnect the power supply.
• Release the Install / Link Test, when the LED's are on.
12
Danfoss Link™ HC
Danfoss Link™
HC Install / Link Test
VIFZL35X
© Danfoss
04/2011

Publicité

Table des Matières
loading

Table des Matières