Bosch DHR1FZUC Manuel D'installation page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 3: INSTALLATION
1. Hold the blower on the wall.
Note the direction of the air flow.
2. Mark the four (x 4) mounting holes.
At least one screw must be installed through a
stud.
All hardware must be suitable for the wall's
construction materials.
Ensure the air outlet points downward.
3. Wall break:
Mark and drill a guide hole and a separate hole for
electrical conduit.
4. Drill the 4 x ¼'' (6,3 mm) Ø mounting holes.
Insert wall anchors and screw the blower to the wall.
5. Connect the duct from the blower to the extractor
hood and feed to the outside.
min. 40"
min. 40"
min. 40"
(101.5 cm)
(101.5 cm)
(101.5 cm)
min. Ø 6½"
min. Ø 6½"
min. Ø 6½"
(16.5 mm)
(16.5 mm)
(16.5 mm)
10⅞"
10⅞"
10⅞"
(276 mm)
(276 mm)
(276 mm)
5¼"
5¼"
5¼"
(133 mm)
(133 mm)
(133 mm)
8 8
"
"
"
5
5
5
/
/
/
16
16
16
(211 mm)
(211 mm)
(211 mm)
"
"
"
13
13
13
/
/
/
16
16
16
(21 mm)
(21 mm)
(21 mm)
min. Ø ¾"
min. Ø ¾"
min. Ø ¾"
(19 mm)
(19 mm)
(19 mm)
½"
½"
½"
(12.7 mm)
(12.7 mm)
(12.7 mm)
3 3
"
"
"
15
15
15
/
/
/
16
16
16
(100 mm)
(100 mm)
(100 mm)
16
16
16
"
"
"
11
11
11
/
/
/
16
16
16
(424 mm)
(424 mm)
(424 mm)
4

Publicité

Table des Matières
loading

Table des Matières