Board Description; Connection Of The Board; Installing The Fuse; Connection Of The Power Supply Line - Videotec WAS Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 37

6.5 Board description

The operation is performed only for a pump
with a 5m or 11m delivery head.
BOARD DESCRIPTION
Connector
Function
J5
Power supply for the board
FUS1
Power supply selection fuse (230Vac)
FUS2
Power supply selection fuse (120Vac)
FUS3
Power supply selection fuse (24Vac)
Tab. 1
Fig. 7
MNVCWAS_2222_EN
FUS1
FUS2
FUS3
J5

6.6 Connection of the board

Electrical connections must be performed
with the power supply disconnected and
the circuit-breaker open.
The operation is performed only for a pump
with a 5m or 11m delivery head.
Identify the position of the fuses (FUS1, FUS2, FUS3)
and the power supply terminal (J5) on the pump
control board. (6.5 Board description, page 9).

6.6.1 Installing the fuse

Depending on the power supply voltage
choose the right fuse holder.
230V
FUS1
Fig. 8
The board is supplied with the fuse in the following
position: FUS1, 230Vac (6.5 Board description, page
9).
6.6.2 Connection of the power supply
line
The power supply cable must be covered
by the silicone sheath (01) supplied. The
silicone sheath must be fastened with the
corresponding cable tie (02).
J5
Fig. 9
Use a suitably sized cable to connect the power
supply terminal J5 to the mains.
120V
24V
FUS2
FUS3
01
02
Neutral (N)
Phase (L)
9

Publicité

Table des Matières
loading

Table des Matières