Preparation Before Installation - Wellis Divido ACS0190 Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Preparation before installation

1.
The size of the hole in the wall for installation complies with the dimension required
below.
2.
Requirement of water pipe: left side is for hot water, right side is for cold water.
3.
Water pressure: 0.05 Mpa- 1.0 Mpa
Best performance at: 0.05Mpa-1.0 Mpa
Temperature: 5 °C-90 °C
The required size
of the hole in the
wall is :
Length ≥ 180mm;
Height ≥ 240mm.
The minimum
depth of the
e-box is 84mm,
maximum is
106mm.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Divido acs0191

Table des Matières