Puller Operation - Greenlee G3 Tugger System Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Puller Operation

After fishing the rope through the conduit, wind it
around the capstan. The puller will pull at two different
speeds depending on whether the rope is on the large
or small diameter. To pull at the lower speed, place
the rope at the inner most part of the smaller capstan
diameter and wind the rope clockwise and outward. To
pull faster, do the same on the large diameter section of
the capstan.
Low Speed
High Speed
Greenlee Tools, Inc.
When ready to start pulling cable, use only a few
wraps of rope on the capstan at first. Using too many
wraps will reduce your ability to control the rope on the
capstan. Use the right angle sheave to position yourself
so you are not in line with the high-tension rope in case
it, the cable or the connector breaks.
Turn on the puller and gradually apply a tailing force to
the free end of the rope. If the tailing force becomes
uncomfortably high, turn off the puller and add another
wrap. If the rope starts climbing up the inside ramp
of the capstan, ease up in the tailing force to allow it
to settle down to the base diameter. If it is continually
climbing up the ramp, turn off the puller and remove a
wrap.
14
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
®
G3 Tugger
System

Publicité

Table des Matières
loading

Table des Matières