Télécharger Imprimer la page

GIA giatsu PREMIUM R32 Manuel De L'utilisateur Et D'installation page 41

Unité extérieure
Masquer les pouces Voir aussi pour giatsu PREMIUM R32:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 52
Installation of the Unit
3. Connecting the Pipe at the Indoor Unit Side
Detach the caps and plugs from the pipes.
CAUTION!
● Be sure to apply the pipe against the port on the indoor unit correctly. If the centering is
improper, the flare nut cannot be tightened smoothly. If the flare nut is forced to turn, the
threads will be damaged.
● Do not remove the flare nut until the connection pipe is to be connected so as to prevent
dust and impurities from coming into the pipe system.
Centering the pipe against port on the indoor unit, turn the flare nut with your hand.
Table 6 Flare nut tightening torque
Pipe Diameter (Inch)
Tightening Torque (N·m)
CAUTION!
Be sure to connect the gas pipe after connecting the liquid pipe completely.
4. Connecting the Pipe at the Outdoor Side Unit
Tighten the flare nut of the connection pipe at the outdoor
unit valve connector. The tightening method is the same as
that as at the indoor side.
5. Checking the Pipe Connections for Gas Leaking
For both indoor and outdoor unit side, check the joints for
gas leaking by the use of a gas leakage detector without fail
when the pipes are connected.
1/4
3/8
15-30
35-40
13
5/8
1/2
60-65
45-50
3/4
7/8
70-75
80-85
Fig.7

Publicité

loading