Installation - LIVARNO LUX 304540 Instructions De Montage, D'utilisation Et Consignes De Sécurité

Projecteur solaire led
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

˜ Installation
Note: The included mounting material is suitable for ordinary solid
concrete or masonry construction. Other wall substrates may require
other fastening materials. Seek specialist advice if necessary.
Note: You will need an electric drill.
m CAUTION! RISK OF INJURY! Read the operating instructions
for your drill.
m CAUTION! Ensure that you do not damage any electricity
cables in the wall or ceiling.
When selecting the mounting location, pay attention to the following:
Ensure that the spotlight 3 illuminates the desired area. You can
 
swivel the spotlight 3 into the desired position.
Ensure the sensor 4 covers the desired area. The sensor 4
 
has a maximum coverage range of approx. 5 to 8 m, with a
coverage angle of about 90° (depending on the mounting
height – a height from 1.8 to 2.5 m is ideal) (Fig. D: HG04465A
or Fig. F: HG04465B).
Ensure the sensor 4 is not illuminated at night by street lighting.
 
This can influence its functioning.
Ensure that the solar panel 1 is mounted in a place with direct
 
sunlight.
14
GB/IE/NI

Publicité

Table des Matières
loading

Table des Matières