Télécharger Imprimer la page

BIG RED JACKS TRF42009 Manuel page 5

Publicité

Les langues disponibles

Les langues disponibles

5. Mount the L-brackets (NO.8) with the support
pillar (NO.3), using the screws (NO.9), washers
(NO.10) and the nuts (NO.11), then tighten the
screws .
6. Do this step upside down.
18
18
After threaded rod assembly has been inserted
into tube install truss bearing assembly: first
install the truss bearing (NO.20), after bearing
(NO.20) has been installed and then screw
handle (NO.21) to threaded rod assembly
(NO.19). Secure and tighten before rotating pillar
assembly.
18
7. Connect the outer pillar (NO.18) to the saddle
base (NO.2). To adjust the position of the jack
stand, use the Lock Bolt (NO.15), Washer
(NO.16) and Hitch Pin Clip (NO.17).
8. Attach the saddle (NO.22) with the threaded rod
assembly (NO.19) using the screw (NO.6).
9. Check that all hardware is secure and tight.
10. Hoist Stand is now ready for use.
5

Publicité

loading