Install The Middle Handle; Install The Upper Handle; Install The Chute-Rotation Box; Install The Chute Deflector - GreenWorks Pro SNB403 Manuel D'opérateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
7.2

INSTALL THE MIDDLE HANDLE

1. Align the holes in the middle handle (15) and the lower
handle (13).
2. Put the bolts (17) through the middle handle (15) and the
lower handle (13).
3. Tighten the handle knob (16) onto the bolt (17).
4. Repeat for left/right side.
7.3

INSTALL THE UPPER HANDLE

1. Align the holes in the middle handle (15) and the upper
handle (14).
2. Put the bolts (17) through the holes.
3. Tighten the handle knobs (16) onto the bolts (17).
4. Do the same operation on the other side.
7.4
INSTALL THE CHUTE-ROTATION
BOX
23 24
19
18
English
1. Align the holes in the panel of the chute-rotation box (23)
and the switch box (24).
2. Put the chute-rotation box screws (18) through the holes.
3. Tighten the chute-rotation box screw nuts (19) with a
wrench (not included).
7.5
INSTALL THE CHUTE
DEFLECTOR
1. Align the grooves (26) of the discharge chute with the
slot (25) on the chute housing.
2. Push the discharge chute (7) into position.
3. Tighten the discharge chute screws (18) with a Phillips
head screw driver to lock the discharge chute.
7.6

INSTALL THE BATTERY PACK

If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the engine stops before
you install or remove the battery pack.
Read, know, and follow the instructions in the battery
and charger manual.
8
WARNING

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

2602502

Table des Matières