Télécharger Imprimer la page

tiko Energy Solutions Bridge-Box Athos Mode D'emploi page 5

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Bridge-Box User's Manual
Installing the Bridge
Step 1
Remove power from the electrical panel.
Step 2
Remove the cover panel so you can access the wires.
Step 3
Ensure that there is a short-circuit protection (breaker or fuse) before
the Bridge no larger than 230 VAC 10 A.
Step 4
Put the Bridge on the DIN rail of the home distribution box and ensure
the hook is locked properly (IMAGE 5).
Connect the right SBUS of the Bridge to the left SBUS of any other
device that is part of the installation. Chain as many devices to the right
side of the Bridge as required for the installation.
An SBUS is connected in one of the 2 ways:
Use Cover B and Cover C (IMAGE 3) to close the left openings of the
Bridge (IMAGE 8).
Step 6
Connect the wires to the Bridge (IMAGE 9):
tiko Energy Solutions AG
Installation by person with electronical expertise and trained on this
product only!
Do not install the device unless you have removed the main power sup-
ply (main breaker or fuses)!
Using the SBUS interconnector: Plug the SBUS connector in
one of the devices and slide the Bridge along the DIN rail to-
wards it (IMAGE 6). Use the Clip A to prevent the SBUS from
being disconnected (IMAGE 7).
Using the SBUS cable: Connect the Bridge to the other device
using the provided SBUS cable. Warning: SBUS cables shall not
be close to power cables. Minimum clearance is 10 mm.
Connect a phase to the left terminal clamp ❶.
Connect a neutral to the right terminal clamp ❷.
Tighten all clamp screws with appropriate torque. Insuffi-
cient clamping force can result in high contact resistance
that leads to device heating and can result in a fire hazard.
English
Installation
5 / 48
IM-0007-0002 Rev. 7

Publicité

loading

Produits Connexes pour tiko Energy Solutions Bridge-Box Athos

Ce manuel est également adapté pour:

Cmb-01.1011-01-p1