Pump Down; Dry Concrete; Service Contact - Panasonic WH-UD03JE5 Serie Mode D'emploi

Ballon + module hydraulique air/eau
Masquer les pouces Voir aussi pour WH-UD03JE5 Serie:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 268
Menus
For installer
Menu

Pump down

7.2
To set the pump down
operation.

Dry concrete

7.3
To dry the concrete (fl oor, walls,
etc.) during construction.
Do not use this menu for any
other purposes and in period
other than during construction

Service contact

7.4
To set up to 2 contact names
and numbers for the User.
34
Default Setting
Setting Options / Display
Pump down operation
ON
Edit to set the temperature of dry concrete.
ON / Edit
Edit
Heating temperature
for drying the
Stages: 1
concrete.
Temperature: 25 °C
Select the desired
stages: 1 ~ 10,
range: 1 ~ 99
ON
Confi rm the setting temperatures of dry
concrete for each stage.
Service engineer's name and contact number.
Contact 1 / Contact 2
Contact 1 / Contact 2
Contact name or number.
Name / phone icon
Input name and number
Contact name: alphabet a ~ z.
Contact number: 1 ~ 9

Publicité

Table des Matières
loading

Table des Matières