Installation; B.1 Location; Mounting - Caloritech GE Serie Instructions D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

B.

INSTALLATION

All applicable codes must be adhered to. For optimum
performance, the heater should be installed as follows:
B.1
Location
1.
Ensure there are no obs tructions that may impede the
heater's air inlet or discharge. Refer to Figure 1 and
Figure 2, page 4, for minimum clearances.
2.
Ensure the air discharge is not directed at a thermostat.
3.
Ensure the air discharge is not directed towards areas of
heat loss, such as windows.
4.
Ensure the air discharge is directed along and at a slight
angle toward exterior walls.
5.
If equipment freeze protection is important, direct air discharge
at equipment while maintaining minimum clearances.
B.2

Mounting

CAUTION. This symbol indicates a potentially
hazardous situation, which, if not avoided, may result in
personal injury or damage to the equipment.
CAUTION
1.
The heater must be permanently mounted.
2.
The mounting surface must be strong enough to:
– Support the heater's weight.
– Provide sufficient stiffness to prevent excessive
vibration.
HEATING ELEMENTS
2¼"
2¼"
2¼"
2¼"
B
2¼"
B
B
B
B
A
A
A
FRONT VIEW
A
FRONT VIEW
FRONT VIEW
FRONT VIEW
S
Figure 1
FRONT VIEW
MOUNTING ARM
MOUNTING ARM
MOUNTING ARM
MOUNTING ARM
MOUNTING ARM
2 1/4"
6 FT
C
MIN.
MIN. INLET
DISCHARGE
CLEARANCE
DISTANCE
6 FT
C
6 FT
6 FT
C
6 FT
WALL MOUNT
C
MIN.
MIN.
MIN.
MIN.
WITH CLEARANCES
DISCHARGE
DISCHARGE
DISCHARGE
DISCHARGE
DISTANCE
DISTANCE
DISTANCE
DISTANCE
WALL MOUNT
WALL MOUNT
WALL MOUNT
WALL MOUNT
WITH CLEARANCES
WITH CLEARANCES
WITH CLEARANCES
WITH CLEARANCES
Figure 2 – Mounting Clearance
4
HEATING ELEMENTS
HEATING ELEMENTS
1/2" x 3/4" MULTIPLE
HEATING ELEMENTS
CONDUIT ENTRY
1/2" x 3/4" MULTIPLE
1/2" x 3/4" MULTIPLE
CONDUIT ENTRY
CONDUIT ENTRY
HEATING ELEMENTS
1/2" x 3/4" MULTIPLE
1" x 1-1/4" MULTIPLE
CONDUIT ENTRY
CONDUIT ENTRY
1/2" x 3/4" MULTIPLE
1" x 1-1/4" MULTIPLE
1" x 1-1/4" MULTIPLE
CONDUIT ENTRY
CONDUIT ENTRY
CONDUIT ENTRY
1" x 1-1/4" MULTIPLE
CONDUIT ENTRY
1" x 1-1/4" MULTIPLE
CONDUIT ENTRY
A
'R' HOLE
S
'R' HOLE
'R' HOLE
S
S
'R' HOLE
U
'R' HOLE
S
U
U
U
T
U
WALL MOUNT
BRACKET HOLE
T
T
PATTERN
T
WALL MOUNT
T
WALL MOUNT
BRACKET HOLE
WALL MOUNT
BRACKET HOLE
WALL MOUNT
PATTERN
BRACKET HOLE
BRACKET HOLE
PATTERN
PATTERN
PATTERN
6"
6"
C
6"
6"
6"
MIN. INLET
MIN. INLET
MIN. INLET
MIN. INLET
CLEARANCE
CLEARANCE
CLEARANCE
CLEARANCE
3.
The single bolt mounting is not designed for high dynamic
loads that can occur during transportation. For heaters that
are to be installed prior to transportation, it is recommended
that temporary blocking or strapping be used to limit
movement of the heater with respect to the mounting
structure. Inspection of the mounting bolt for correct
tensioning is also recommended after arrival at site to ensure
no loosening has occurred in transportation. The mounting
bolt/nut should be torqued to 65 – 75 ft-lbs, refer to Table 5,
page 12.
4.
Install the bracket on the heater with hardware provided.
4.1
Orient the heater to its final position before tightening
all hardware.
4.2
In higher vibration installations use of a removable
thread locking compound such as Loctite
Blue Threadlocker is recommended.
4.3
Correct tensioning of the mounting bolt will include
full compression of the split lock washer and
inspection for correct thread engagement. The
mounting bolt/nut should be torqued to 65 – 75 ft-lbs,
refer to Table 5,
5.
The discharge air louvers are individually adjustable.
'W' HOLE
'W' HOLE
'W' HOLE
'W' HOLE
'W' HOLE
MOTOR
MOTOR
MOTOR
MOTOR
REAR VIEW
REAR VIEW
REAR VIEW
REAR VIEW
REAR VIEW
6" MIN.
CEILING
CLEARANCE
6" MIN.
6" MIN.
CEILING
6" MIN.
CEILING
B
6" MIN.
CLEARANCE
CEILING
CLEARANCE
CEILING
CLEARANCE
CLEARANCE
A
CEILING MOUNT
WITH CLEARANCES
CEILING MOUNT
CEILING MOUNT
CEILING MOUNT
CEILING MOUNT
WITH CLEARANCES
WITH CLEARANCES
WITH CLEARANCES
WITH CLEARANCES
page 12.
Table 1 – Heater & Bracket
Dimensions
210 kW
Dim.
in.
A
17
B
14
MOTOR
C (Depth)
15 1/2 394
R (Hole dia.)
1/2
S
12 1/2 318 17 1/2 445
T
4 1/2
U
4 1/2
W (Hole dia.)
3/4
Table 2 – Installation Height &
Heater Weight
Recommended
kW
Mounting
Height - ft (m)
2 – 10
6 to 8 (1.8 to 2.4)
15 – 40
8 to 12 (2.4 to 3.0)
243™
®
15 – 40 kW
mm
in.
mm
432
24
610
356 19 1/2 495
22
559
13
5/8
16
114
6
152
114
6
152
19
3/4
19
Heater
Weight
lbs (kg)
59 (24)
104 (47)

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Ge203ctl-d

Table des Matières