Télécharger Imprimer la page

Vogel MASTER Serie Mode D'emploi page 57

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
Electric connection THREEPHASE: start direct Y
M
(400 Volts)
Collegamento elettrico TRIFASE: avviamento Y/Δ
M
(400/690 Volts)
START-UP
Before installing the power pump, ensure that the
impeller turns freely without the pump connected to the
power line: to do this, you can reach the impeller (or in
the MASTER power pumps, the rotary part of the grinder)
through the suction mouth.
On three-phase pumps check that the rotation direction is correct,
i.e. clockwise when looking at the pump from above (on the power
pump, check the arrow near the delivery mouth); to do this before
installing the pump, suspend the power pump and start the motor
for a few seconds (on and off): if the rotation direction is not correct,
the power pump gives a recoil in anti-clockwise direction.
When you perform this test, ensure that the pump is at a safe distance from people,
animals and property.
To change the rotation direction, invert the two phases on the power line.
The rotation direction does not need checking on single-phase pumps.
Y
Y/Δ
Yellow/Green
Line 1 U1 = Cable n° 1 Black = Blue
Line 2 V1 = Cable n° 2 Black = Brown
Line 3 W1 = Cable n° 3 Black = Black
Thermal probes A = Cable n° 4 Black = Green
Thermal probes B = Cable n° 5 Black = Green
Conductivity sensor = Cable n° 6 Black = Blue
KIT M/S = OPTIONAL
Yellow/Green
Line 1 U1 = Cable n° 1 Black = Blue
Line 2 V1 = Cable n° 2 Black = Brown
Line 3 W1 = Cable n° 3 Black = Black
Line 1 W2 = Cable n° 4 Black = Black
Line 2 U2 = Cable n° 5 Black = Blue
Line 3 V2 = Cable n° 6 Black = Brown
Thermal probes T1 = Cable n° 7 Black = Green
Thermal probes T2 = Cable n° 8 Black = Green
Conductivity sensor S = Cable n° 9 Black = Blue
KIT M/S = OPTIONAL
EN 10

Publicité

loading