Assembly - GOK LWG 2000 Mode D'emploi D'origine

Masquer les pouces Voir aussi pour LWG 2000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY

Before assembly, check that the product is complete and has not suffered any damage during
transport.
ASSEMBLY, STARTUP and MAINTENANCE are to be carried out by a company
specialised.
See USER QUALIFICATION!
The specialised company and the operator must observe, comply with and understand all of
the following instructions in this assembly and operating manual. For the system to function
as intended, it must be installed professionally in compliance with the technical rules
applicable to the planning, construction and operation of the entire system.
Example of application - LWG 2005 leak alarm with four possible installation situations
for 5 probes.
Probe in each tank with integrated containment basin of a battery tank system (2x).
Probe on the floor of the installation room to monitor flooding and/or to monitor the
containment facility for leaking fuel in a hidden area.
Probe in the containment basin of an oil pump.
Probe in the containment basin of a consuming device to monitor the pressure line.
Alternatively, up to five probes can be connected simultaneously to the LWG 2005 leak alarm.
Only one probe can be connected simultaneously to the LWG 2000 leak alarm.
part no. 15 073 96
Probe
5 / 10

Publicité

Table des Matières
loading

Produits Connexes pour GOK LWG 2000

Ce manuel est également adapté pour:

Lwg 2005

Table des Matières