Télécharger Imprimer la page

OZ Lifting Products TELE-PRO OZTP500DAV Manuel De L'opérateur page 8

Publicité

Les langues disponibles

Les langues disponibles

3. Locate the "keyhole" in the winch drum that accepts the ball end of the cable.
4. Thread the ball end of the cable over the load sheave pulley and towards the winch. The cable
retainer pin may need to be removed from the tip of the boom so the ball will pass over the sheave.
5. Insert the ball end fitting of the cable into the "keyhole" feature in the winch.
6. Ensure that the ball end of the cable slides into the slot in the "keyhole" and cannot be pulled out.
7. Manually spool at least 4 full wraps of cable onto the winch drum. There must be at least 4 full
anchor wraps of cable on the winch drum at all times.
8. Install cable-retainer pin by inserting into holes at the tip of the boom.
NOTE: To ensure the maximum amount of cable can be spooled onto the winch, the cable must
be neatly spooled onto the winch drum. If the cable is not spooled neatly onto the winch drum, the
cable capacity will be reduced and handle effort may increase. Cable that is not spooled neatly can
consume 30% more space on the winch drum, reducing cable capacity.
For Synthetic Cable: There will be a loop braided into the end to the cable. Install the cable as you
would a bare end cable by placing this loop over the retainer bolt and secure with the stamped
washer and lock nut.
NOTE: Dyneema based cables require 8 anchor wraps at all times
Operating the Crane
Warnings & Precautions
Operators should read and fully comprehend this entire manual and all warnings on the TELE-PRO
DAVIT CRANE by OZ Lifting Products LLC® before beginning crane operation. If this manual is not
read and followed completely, injuries and damage may occur. For questions regarding operation,
please contact your OZ Lifting Products LLC® dealer.
Before operating the crane, be sure all parts are clean and properly lubricated. The crane must be in
proper working condition and maintenance records must be up to date to proceed with operation.
The area of operation must be clear of all flammable materials.
It is important to maintain secure footing while operating the crane. Confirm that the crane is
attached securely to a a strong, level, solid foundation before operation. Slowly take up a load,
verifying that it is well supported and balanced before proceeding with operation.
All operators MUST:
• Be trained in proper crane operation and in dealing with potential malfunctions.
• Abstain from use of alcohol, medications, or drugs while operating.
• Avoid operation while tired or distracted.
• Avoid operation if they have a history of seizures or other medical issues that may interfere
with crane operation.
• Have proper coordination and vision.
EN pg.8

Publicité

loading

Ce manuel est également adapté pour:

Tele-pro oztp1200davTele-pro oztp2500dav