KSR KUEBLER BNA Mode D'emploi page 9

Indicateur de niveau bypass
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Installation and commissioning
Slowly open the shut-off
valve at the upper process
connection
Slowly open the shut-off
valve at the lower process
connection. As liquid flows
into the bypass vessel,
the float floats to the top.
The magnetic system
turns the magnetic rollers
of the optical indicator
from „light" to „dark".
The current filling level
is shown after liquid
equalisation between the
vessel and the bypass
level indicator
Always heed the
mounting and
operating instructions
of attachment devices
before putting them into
operation
KSR KUEBLER Operating Instructions Bypass Level Indicator – BNA
Fig. 1: Bypass level indicator, model BNA
T = upper projection
M = centre to centre distance
U = lower projection
GB
9

Publicité

Table des Matières
loading

Table des Matières