Bombard SUNRIDER 700 Manuel Du Propriétaire page 63

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
V-1-2-Tank:
2
3
Ref.
DESCRIPTION
1
Tank*, given capacity 200 litres
2
Vent outlet
3
Tank filler inlet
4
Gauge transmitter
5
Fuel circuit shut-off valve
6
Second fuel circuit shut-off valve: to be used for the twin engine configuration
It may not be possible to use the full nominal capacity of the tank depending on the trim and the load.
A 20% reserve is recommended.
The probe supplied is to American standard:
Impedance (tank empty position)
Impedance (tank full position)
All the dials on the market are compatible, with a few very rare exceptions.
To connect it, refer to the electrical diagram page 21.
INSTALLATION AND CIRCUIT - FUEL
1
WARNING!!!
IT IS VITAL TO HAVE A GAUGE DIAL. IT IS SUPPLIED WITH THE ENGINE
IF YOUR BOAT DOES NOT HAVE ONE, CONTACT YOUR DEALER.
30 Ohms
240 Ohms
Page 18 / 43
5
4
6

Publicité

Table des Matières
loading

Table des Matières