4- Inflating The Buoyancy Chamber - Bombard SUNRIDER 700 Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
BUOYANCY CHAMBER - INFLATING THE BUOYANCY CHAMBER
8
After inflating the buoyancy chamber (see the chapters below), fit the outer flap using the
stainless bars and nuts provided in the buoyancy chamber kit. Apply sealing compound on all the
screws and in the hull holes to achieve watertightness.
II-4 INFLATING THE BUOYANCY CHAMBER
INFLATOR
a. tube end
b. adaptor
c. tube base
d. inflation port
NOTE: An electrical (12 V) high output inflation pump is available as an option (contact your dealer).
"EASY - PUSH" VALVES
To change position
Push
d
In inflating position
The membrane is closed, the
plunger is up
Page 11 / 43
a
b
c
In deflating position
The membrane is open, the
plunger is down
First edition
E
N
G
L
I
S
H
-

Publicité

Table des Matières
loading

Table des Matières