VEHNS GROUP XZ YEAZ Mode D'emploi page 13

Sup boards
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
For initial inflation and to familiarize yourself with your new item, we recommend that you inflate
the board inside at room temperature. The PVC material is soft, which makes installation easier.
If the item has been stored at a temperature below 0°C, allow it to rest at 20°C for 12 hours
before unfolding.
STEP 2: OPERATING THE VALVE
To inflate the board, remove the safety cap from the valve. Turn it counterclockwise to inflate.
Before you start pumping, make sure that the valve pin is in the "upper" position. If the valve pin
is in the "lower" position, press it and turn it clockwise or counterclockwise until it jumps up.
INFLATE
Insert the hose nozzle into the valve of the board and turn the attachment clockwise. After
inflating, remove the hose and close the valve's safety cap to seal it permanently.
CAUTION: If you expose your board to hot temperature or sunlight, please check the air pressure;
if the air pressure exceeds the recommendation, release some air to avoid overstretching the
material.
DEFLATE
Remove water and dirt from the valve and its surroundings before removing the valve safety cap.
Gently press the valve pin to slowly release pressure from the board. After about 10 seconds,
when the air pressure on the board has dropped slightly, push the valve pin down completely
13

Publicité

Table des Matières
loading

Table des Matières