Télécharger Imprimer la page

Error Detection - Waeco PerfectPower PP1000 Instructions De Montage Et De Service

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
8100-8200
12.09.2003
Without remote control
The putting into operation is done with the ON/OFF-switch at the front side of the
inverter. The green LED "Power" illuminates with the switch position ON. The connected
consumer unit should not have more than 50% of the indicated permanent load of the
inverter.
Attention! The inverter must be switched on first and then the consumer unit.
With remote control
The main switch at the inverter must be set to "Off". The putting into operation is to be
done by a keystroke on the foil-keyboard. Then the green LED illuminates. Then switch
on the consumer unit. In the event of failure, the red LED illuminates.
In the event of error, the red LED illuminates.
The following errors are monitored:
1. Undervoltage
2. Overvoltage
3. Overload
4. Excessive temperature
Troubleshooting
1. Undervoltage
The battery capacity being still available is too weak. Recharging the batteries is
necessary.
2. Overvoltage
Check the input voltage at the inverter and compare it with the technical data of the
inverter.
3. Overload
The connected consumer unit takes up too much current. Switch off the consumer unit
and check the current consumption of the consumer unit.
4. Excessive temperature
The inverter has become too hot. Check the ventilation. Possibly the permanent load is
too high under the given circumstances. Switch off the consumer unit and let the
inverter cool down.
After remedying the error, the inverter restarts automatically.
8:45 Uhr
Seite 18
All manuals and user guides at all-guides.com
Putting into operation

Error detection

18

Publicité

loading

Ce manuel est également adapté pour:

Perfectpower pp2000