Télécharger Imprimer la page

Daikin PGDK Mode D'emploi page 20

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 55
5.2
Mounting the product
5.2.1
Mounting the product to a module manifold
MECHANICAL LOADS AND STRESS
Verify that the product is not subjected to mechanical loads and stress when
connecting the product.
If necessary, install a corrugated pipe compensator to compensate for
mechanical stress or tension.
Failure to follow these instructions can result in equipment damage.
1. Remove the insulation.
2. Screw the pump assembly to module manifold.
3. Screw the pipes of the heating circuit to the top connections (no
mechanical stress).
4. Fit the complete insulation.
5.2.2
Wall mounting
MECHANICAL LOADS AND STRESS
Verify that the product is not subjected to mechanical loads and stress when
mounting the product to the wall.
Failure to follow these instructions can result in equipment damage.
Mounting
NOTICE
NOTICE
FA PG - 06/2019 - 008.15 442 99_02 - EN
EN
18

Publicité

loading

Ce manuel est également adapté pour:

Pgmk156077156075