Mounting Location - Tecma Nano ECO Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fig. E
IF NEEDED-8" above
waterline ALL TIMES!
K
Floor-minimum 3/4"
A.
Fresh Water Hook-up
K1
B.
Wiring Harness
K3
C.
Bezel (Fig. F)
K4
D.
Wall Switch
K5
Thetford Water Pump (Raw Water Install)
K6
Raw Water Pump Hook-Up
K8
E.
Lower Discharge Check Valve (Vertical)
#4
Before starting the installation, consider and plan for the following:

Mounting Location

■ Ideally, the Nano Eco toilet should be installed in a location that is higher than the holding tank. A (maximum) 6' rise between the
toilet and holding tank will not impact performance.
■ Using toilet and supplied template, verify that the installation site has:
sufficient clearance between toilet and nearby wall so that water supply hose and discharge hose are not kinked
room for maintenance accessibility
■ The floor supporting the toilet is level and strong enough to support toilet and weight of any potential user.
■ The floor structure is strong enough to securely anchor toilet using supplied screws; 3/4" minimum.
■ The flooring is water-resistant so structure and anchoring integrity are maintained.
Tecma Nano Owner's & Installation Manual
Orientation
D
C
G
K6
OR
B
A
A1
A.
Filter or Strainer (Raw Water Install)
A1
A
B.
Water Tank (Fresh Water Install)
B
C.
Non-Thetford Water Pump (Raw Water
Install)
Fresh Water Pressure Pump (Fresh Water
B1
Install)
C
D.
3/4" Water Supply (Raw Water Install)
C1
E.
1/2" Water Supply (Fresh Water Install)
D
F.
Vented Loop
K5
K4
K3
K8
E
F
4
H
C1
B1
I
E
A.
F
B.
G
C.
H
D.
E.
J
F.
G.
K
6
K1
J
H
Fresh Water Install
Toilet Discharge Hose
Relay Module
Water Pump Wiring (Fig. B)
Discharge Line (above or below floor)
I
Holding Tank
Boat/Craft 12V DC Power Source
Mimimum 3/4" floor
www.thetfordmarine.com

Publicité

Table des Matières
loading

Table des Matières