CABINET PREPARATION
6. Cut the openings for the following installation:
■ Standard counter top installation, see Fig. 6A
■ Deep counter or island installation, see Fig. 6B
NOTE:
The sides or bottom of the opening may be solid combustible or non-combustible material. If the bottom is solid,
provide a 6" x 6" cutout in the left rear corner for the gas inlet and power cord clearance. See Fig. 4.
Front projects outward as shown
Front projects outward as shown
from standard depth cabinet.
from standard depth cabinet.
Flush with cabinets
Flush with cabinets
Front flush with cabinets; a minimum of 26-1/2"
Front flush with cabinets; a minimum
cabinet depth required
of 25
cabinet depth required
3/4"
Fig. 3
Cutout
6"
6"
Fig. 4