Fisher & Paykel DCS CPU/CPV-484GG Guide D'installation page 11

Masquer les pouces Voir aussi pour DCS CPU/CPV-484GG:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PLANNING THE INSTALLATION
RECOMMENDED INSTALLATION SEQUENCE
Install components in the following order:
A. Vent Hood
B. Backguard System (sold separately)
C. Cooktop
1. Locate cooktop according to cooktop installation instructions.
2. Measure distance from counter surface to top of trim on cooktop adding 1/4" for backguard clearance.
3. Transfer this measurement to the wall. This will mark the bottom of your backguard.
4. From this line measure 29-3/4" up wall to mark top of 30" backguard. This is the minimum height that the
bottom of your vent hood can be installed.
5. Follow vent hood manufacturer's installation instructions to install vent hood.
6. Follow backguard installation instructions to install backguard.
7. Connect gas and electric connections and slide cooktop into position.
NOTE:
A manual gas supply valve must be installed. See section 'Gas Hook-up'.
9
US
CA

Publicité

Chapitres

Table des Matières
loading

Table des Matières