Prepare For Installation Of The Sauna Control Unit; Install Sauna Control Unit - Sentiotec A2 Instructions De Montage Et Mode D'emploi

Système de commande de sauna
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
1
Prepare for installation of the sauna control unit Figure 1
The sauna control unit is installed outside of the sauna cabin or in accordance with the cabin manufacturer's
recommendations. The electricity is supplied by a permanent connection.
CAUTION – Damage to the device:
The sauna control unit is protected from spray water (protection class IP X4). However, the sauna control
unit should not come into direct contact with water. Install the sauna control unit in a dry place. Comply
with the ambient conditions of max. 40° Celsius and maximum air humidity of 95 per cent.
1. Slightly depress the locking device 5 and remove the upper part of the housing 6.
2. Screw in cross-head screw of a length of 16 mm for the upper anchor point 1 up to a distance of 7 mm from
the sauna wall (see detail) and suspend lower section of housing 4 to the reverse.
2
Install sauna control unit Figure 2 6
1. Conduct F I temperature sensor leads with an excess temperature fuse through the installation opening 6
into the lower section of the housing 1 and connect to terminal block 3 in accordance with the circuit diagram.
CAUTION – Damage to the device:
The sauna control unit may only be used to control and regulate 3 heating circuits with a maximum
heating output of 3.0 kW per heating circuit. The sensor cables must be installed separately from
other network and control cables.
2. Conduct heating system connection cables through the installation opening 8 into the lower section of the
housing 1 and connect to the terminal blocks 7/ C in accordance with the circuit diagram.
3. Conduct network connection cables (as permanent wiring) through the installation opening 9 into the lower
section of the housing 1 and connect to the terminal blocks in 7/ C accordance with the circuit diagram.
4. Conduct light cables through the installation opening A into the lower section of the housing 1 and connect
to the terminal blocks 7/ C in accordance with the circuit diagram.
5. Screw in two cross-head screws of a length of 20 mm into the lower anchor point 5 Verify the secure fit of the
lower section of the housing 1.
WE DO IT FIRST.
Instructions for installation and use – only for experts
P. 5/16
EN

Publicité

Table des Matières
loading

Table des Matières