Handling

Arrange a suitable area with flat floor for machine
unloading and storage operations.
D2.1

Procedures for handling operations

For correct and safe lifting operations:
• Use the type of equipment most suitable for
characteristics and capacity (e.g. electric pallet truck
or lift truck);
• Cover sharp edges;
• Check the forks and lifting procedures according to
the instructions given on the packing;
Before lifting:
• Send all operators to a safe position and prevent people
from entering the handling area;
• Make sure the load is stable;
• Make sure no material can fall during lifting;
• Manoeuvre vertically in order to avoid knocking;
• Handle the machine, keeping it at the minimum height
from the ground;
ATTENTION!
For machine lifting, do not use movable
or weak parts such as: filters, electrical
cables, etc.
D2.2

Shifting

The operator must:
• Have a general view of the path to be followed;
• Stop the manoeuvre in case of hazardous situations;
D2.3

Placing the load

Before placing the load, make sure the way is free and
that the floor is flat and can take the load.
D3

Storage

The machine and/or its parts must be stored and
protected against damp, in a non-aggressive place free
of vibrations and with room temperature of between
-10 °C / 14 °F and 50 °C / 122 °F.
The place where the machine is stored must have a
flat support surface in order to avoid any twisting of the
machine.
ATTENTION!
Do not make modifications to the parts
supplied with the machine. Any missing
or faulty parts must be replaced with
original parts.
E

INSTALLATION AND ASSEMBLY

ATTENTION!
Machine installation, maintenance and
commissioning operations must only be
carried out by specialised technicians
provided with all the necessary PPE
(e.g. safety shoes, gloves, goggles,
overalls, etc.), equipment, tools and
aids such as platforms and scaffolding
(fig. 2/B page 3).
ATTENTION!
Make sure the main switch of the panel
the machine is connected to is locked
in the open "0" or off position.
E1

Customer responsibilities

The tasks and works required of the Customer are:
• The installation of an adequate electrical power supply
ahead of the machine, as indicated in the equipment
specifications (see Table 2).
• Ducting for the electrical connection between the
workplace electrical panel and the equipment;
• Adequate water supply and drain connections and
other connections given in the table (see Table 2);
• General workplace lighting to guarantee at least
500 lx according to par. 5.2.2 of Standard EN 12464-1
or according to a value established by the current
regulations in the country of use.
E2
Characteristics of the place of machine
installation
The machine is designed for installation in professional
and not domestic-type kitchens.
The product must only be combined with Electrolux
Lengthwise 6-10 Racks 1/1 ovens.
A water supply with 3/4'' connection and a water drain
with 1/2'' connection must be present near the machine
workplace.
E3

Machine space limits

A suitable space must be left around the machine
(for operations, maintenance, etc.). The passages
enabling personnel to operate on the machine must be
at least 700 mm wide, except at the back of the machine,
see diagram on page 2.
This distance must be increased in case of use
and/or transfer of other equipment and/or means, or if
exit routes are necessary inside the workplace.
E4

Preliminary positioning

Unless otherwise agreed, the machine is supplied in a
single unit.
The machine must be taken to the place of installation
and removed from the packing base only when being
installed.
31